Friday, May 24, 2019
Padma Bridge Paragraph Essay
BANGLADESH ECONOMY IF PADMA BRIDGE NOT ESTABLISHEDINTRODUCTION The Padma duo is a useful road raile bridge across the Padma river to be constructed in Bangladesh. When completed it depart be the largest bridge in Bangladesh and the first fixed river crossing for road traffic. It will connect Louhajang, Munshiganj to Shariatpur and Madaripur, linking the south-west of the country, to northern and eastern regions. The project covers three districts Munshiganj (Mawa point/North bank), Shariatpur and Madaripur (Janjira/South bank). The total area of land to be acquired and required for its components is 918 hectares.The sequestration of land for the construction yard will be for six years on a rental basis. As per the new design, an additional 144.04 ha has been identify for acquisition, bringing the total to 1062.14 hectares. This additional land is required because project site lost significant land due to erosion, for transition structures and due to a sort in railway alignment. The two-level steel truss bridge will carry a four-lane highway on the upper level and a hit track railway on a lower level. The project will include 6.15km long and 21.10 m wide bridge, 15 km of mount roads, toll plazas and service areas.Literature Review It is a sad state of affairs when an entire nation has to suffer for the actions of just a few. The World marge has claimed to have found credible evidence of a high-level degeneration conspiracy among selected government officials involved in the Padma Bridge project. The cancellation of the $1.2 billion credit for the Padma Bridge project will have an adverse effect on the Bangladesh economy for years to come. It will also make it difficult for the current government to get going what it thought would be one of its signature achievements.The government will look for alternative sources of funding for the Padma Bridge. Malayasia has shown some interest. However, the World Bank decision will certainly affect the terms and con ditions that any prospective donor would offer for funding the project. And it definitely would not go in our favour.Hypothesis If government of Bangladesh solve the bother about the corruption issue and baffle some other sources to build ta bridge and to help the busniess and economy of Bangladesh. Firstly we have to stop corruption and find out the sources who will help us to build Padma bridge.Objectives1. Main objectiveThe main objective is to find out the main causes of establishing of padma bridge and find out a response of a problem.2. Specific objectivesa. find out the potential causes of padma bridge corruptionb. find out a complete solution of this situationc. Business affects and benefits of the problem and solution.2. Materials and MethodsDescriptionMaterials I want to complete my research with possible data and documents from every source I can go through with(predicate) Research Methodology a. reason of not starting the project b. affects in business c. who are res ponsible.Statistical Approachbusiness affect for not mental synthesis padma bridgewhat is the solutions to solve this problem3. Timeframe I need approximately 15 days for this research. Because in 15 days I use 10 days for collecting the breeding and 5 days for analyze and complete the research. Working time Every day 900am 800pm (Except Friday & Saturday).4. Statement of Budget 1. tranportation 4000/ 2. food 3000/ 3. Equipment 3000/ TOTAL 10000BDT5. beginning The Daily star,13th january 2013 Wikipedia of padma bridge
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment